The Good Stuff:
- We got a good watering on the yard in San Antonio. I doubt it will last for three weeks until I head back down there at the end of the month, but it was the best we could do.
- Mr. L got pickets painted and a frame assembled for a new gate on the inner side yard.
- I got some work done on Polar Bear on the Loose
- Mr. L had a rehearsal and recording session for the New Braunfels Village Brass band. I think the CD is going to sound good.
- Sneaky is doing fine. So are the other kiddos.
- I had some uncomfortable back spasms last night. I slept on a contoured pillow last night, and that seemed to help.
- We didn't get several things we'd both agreed needed to get done done while we were down there. Mr. L is strongly avoiding trips under the house. I don't blame him, but it has to get done. If he won't call in a plumber to do the job, he's going to have to go under there and do it. (This is still the tub drain repair, and it's been almost a year that he's been working on it. Not being able to shower down there is getting really old.) Having someone else do it is not open for discussion. Sigh. There are disadvantages to marrying a stubborn man.
- More work on PBOTL
- Yard work
- Resume recumbent bike riding as well as begin reassembly of the shroud (assuming no problem can be found for the mysterious noise).
- Continue doing the stretching exercises for my hip and lower back. I'd stopped doing them for several months, and that was a mistake.
- Add stretching exercises for my ankles and wrists. (If you have an iPad2 or newer, iMuscle2 is a wonderful app. It's intended for physical therapists, but it really shows your muscle layout as well as weight training and stretching exercises you can do for each one. You can customize a workout program as well.)
No comments:
Post a Comment