We got bills paid in San Antonio. I upgraded to the iPhone 6 Plus (I love it), but I have to take the laptop back and have it sent off for repairs -- it has a memory problem. I got no yard work done and very little type-in or other work completed. I did get some reading done. After numerous trips under the house over two days, Mr. L has declared the project completed. This means we can take the next steps in the bathroom remodel that's been in the works for around ten years.
Stephen, thanks for the post card.
Mr. L wanted to do several things today that didn't require a lot of effort (except for moving the scaffolding in preparation for the next area on his shingle project), so he dragged me all over the county on various errands.
The Week Ahead:
- Get a haircut
- Pay bills
- Set up the deer cam and refill the feeder for the final census for the year.
- Polar Bear on the Loose type-in. I'm almost finished.
- Prepare the house for company -- older daughter and husband may visit Saturday
- Remind Mr. L to put together and print the Christmas cards
- Prepare the MacBook Pro to go in for the memory repair (most likely memory replacement), and prepare the MacBook Air to function as my primary machine for a week or so while the Pro is sent out for repairs. (I saw the 5k iMac....swooon)
- Prepare end of year posts, prepare goals for new year, schedule blog posts through the end of the year, so I don't have to worry about them.
- Get A-Z Ebooks finalized and ready for my trusty beta readers to read and critique.
- Get Polar Bear on the Loose finalized and ready to go to beta readers around the first of the year.
- Study.
1 comment:
If you only got one postcard, more are coming. I've mailed two and have four more to send. The postcards are at least 40 years old. They were made before East Central changed its name in 1974. I found them at the library. Someone had left them on the free desk.
So looking forward to reading Polar Bear on the Loose!
Post a Comment